Read our Blog

Back

0 Piramal

Your vote is:
5.00 of 1 votes

Client – Piramal Pharma Limited

Location – Morpeth, Northeast England

Length of Project – 21 Weeks

Value – Not Disclosed

Our Role – Construction Management

Pharmaceutical development is where our talents lie. This particular project was working on an

existing pharmaceutical facility in order to improve their current installation. Working on site, while
the facility is still up and running comes with its due challenges and require rapid response to any
and all risks involved.
The project for us included the refurbishment and construction of GMP and plant space for the
installation of a ViiV dryer. The installation of a new filter dryers and pack off booth was undertaken
on a live pharmaceutical facility.
It was a challenging project for the team, particularly with logistics, as the majority of the installation
was to come through a section of external cladding on the first floor while the remainder of the
facility was to remain live for the majority of the construction.
To provide the services to the dryer, planning was key, to tie in with shutdown periods in order to
ensure there were zero business interruptions within production. This falls inline with the Wade
commitment to accelerate the distribution of medicine and pharmaceuticals.
Wade CM ensured that all QA was available for signing off in line with IQ/OQ operations. A
successful project aligned to the clients’ goals. Strength is unity – and to use, this meant efficient and
in detail communication between us and the Client to facilitate successful installation on this project.

Find us